Estimates that show their work.
Taylor reads the full bid package — drawings, specs, addenda, wage schedule, bid form — performs the takeoff, prices labor, material and sub lines, and issues an estimate where every line traces to a sheet or a spec section. Missing information reads UNKNOWN, never a guess.
| Line item | Qty | Unit | Source | Basis |
|---|---|---|---|---|
| Branch wiring · floors 2–4 | 38,400 | LF | E-402–E-405 | Wage sched. line 16 × takeoff; waste 5% |
| Light fixtures Unknown | — | EA | Fixture schedule | Not in the set — request from architect |
What changes on day one.
The package arrives Friday, the bid is due in eleven days
Taylor starts reading the same day. Rev 1 comes back with a conflict log and an UNKNOWN list so you know what to chase before you price.
Addendum 02 changes the electrical scope
Replace the sheets; Taylor reissues Rev 2 with the delta line by line. A revision with a reason, not a restart.
The fixture schedule isn't in the set
The line reads UNKNOWN with the reason and who has it. The total is withheld until it's resolved. A request to the architect is drafted for your approval.
Scoped and priced in writing before we start.
Every engagement starts with a Project Review about one real project. We return scope and one set price, in writing. Price moves only if scope moves. After the first project the crew stays on under a separate monthly arrangement — hosting, monitoring, new projects, a Monday report.
Asked on every call.
What does it cost? +
What happens when Taylor doesn't have enough information? +
Can it stamp drawings or act as my architect? +
Book a project review.
Bring one project. We'll show you what the crew would do with it.
Not sure where to start? Two quick questions, then your details.
Fill in the short form on the booking page and we reply the same business day to set a time. Prefer to talk? Call 646-281-8368.